LoundSide Build Project part 3
(May take several seconds to load)
At this point we install a connection to drains for future plot 3, Storm and Foul runs on 100mm Pea Gravel Bed

Pea Gravel now completely covers Pipework, over 100mm coverage,
after Compacting with a Whacker plate - Backfilling Starts

Now Backfilled ready for more compacting and then Type 1 Crushed stone to Lay on Geotextile Mat
This Geotextile will stop the Type 1 Crushed stone from washing away under the Block Paving after rain
Geotextiles are permeable fabrics which have the ability to separate, filter, reinforce, protect, or drain.

Looking down last part of Driveway towards Aco Gulley where Garages will stand (behind the Parking Spaces)

Looking from Plot 3 Drive, Type 1 crushed stone laid ready for roller

Looking at Curve going round towards the garages, box is for service connections

Look at Driveway formation from Highway

Reverse angle, looking at Driveway formation (Type 1 crushed stone on Geotextile)

Closer look at Service Ducts, ready for connection

Vibrating 1.5 Ton Road Roller now smooths out the Drive ready for next stage

Driveway Construction Stage Video
Main Road Kerb Concreted in place with one cube of Concrete

Reverse Angle looking at Road Kerbs on left, and you can just see paving kerbs opposite

Paving kerbs taking driveway round to Highway from garages

Cables and Pipework now connected ready for backfill (1 gas duct for future use left in place)

Service connection areas now jointed up and back filled

Connection area boxes now gone and back filled

Charcoal Soldiers Edging for Block paving set in readt mixed concrete

Long Radius of Edging Soldiers for Block Paving