Build Cost
Demolition /site clearance
Roads + Sewers
Excavation of Footings & Spoil removal
Reinforcement /Concrete Foundations / slabs
Tanking / DPM's
Brickwork to DPC
Ground floor joists
Brickwork From DPC
Lintols
1st floor Joist
Eaves/ wall plate
Roof- Timber Construction/
Brickwork Cut up's
Roof- Felt/ Batten & Tile/ Slate
First Fix Electrics
First Fix Plumbing
First Fix Joinery
Glazing – (Water tight)
Plastering – Board & Scim
Second Fix Electrics
Second Fix Plumbing
Second Fix Joinery
Kitchens
Bathrooms
Electricity Connection
Water Connection
Gas Connection
Finals [painting + finishes]
Landscaping/Walling
Appliances
Build Cost Sub Total
Contingency = 10 % of Sub Total
Total Build Cost
You will need to research material prices and obtain 2 or 3 quotes for each of the stages or catagories to be able to Assign realistic (fixed) amounts to cover the materials and Labour for each stage, use a spreadsheet if you can, then add up the total, the contingency should be around 10% of your total to cover any unseen or unplanned events or cost’s.
This list is also the order in which work needs to be done and is a familiar labeled format throughout the building industry that trades understand and work too, for a more detailed list or "Programme of Work" follow the link below where you can download a spreadsheet with a further example of what work needs to be done and when.
Also see
House Building Program of Works
Self Build Help - Ask your Questions
Building a House or Extension - Where to Start
If you would like further explanations of the above examples please contact us with no obligation