Self Build New Homes

Attention to Detail is always Important!

Home
Building - Where to Start
Self Build Help
Build A House
Build An Extension
Project Manager
NHBC Builder
House Builder
Sheffield Builders
Latest Site Anouncements
Contact Us
Site Map
About Us
Chapeltown Build 2&4 Beds
4 Bed New Build Progress
4 Bed Build Progress 2
4 Bed Build Progress 3
Chap' 2 Bed Build part2
LoundSide Project part1
LoundSide Project part2
LoundSide Project part3
LoundSide Project part4
Slide Show of New Build 1
Slide Show of New Build 2
kitchen Video & Pics
New Homes Videos
New Homes in Chapeltown
New Homes in Sheffield
Finding Info on the Net
Past House Build Projects
Established Homes Built
Build a Recording Studio

 

 

New 4 Bed Home Construction Progress Part 2

 

 

This page shows the start of construction of a 3/4 Bed Dormer Bungalow at LoundSide, Chapeltown S35 2UR, (Plot 3) by Self Build New Homes 

 

 

 

 The New Homes will have the benefit of a  NHBC 10 year Buildmark Cover giving the owners peace of mind that if any major defects are found or appear, they will be rectified free of charge for upto a period of 10 years!.

 

You can now follow our 3/4 Bed House Build

progress on our Blog :- http://selfbuildnewhomes.blogspot.com 

 

 

Site Pictures and Video's 

 

 

Foundation (Kicker) Blocks Laid 

 

 

 

 

Note Lintols Bridging the corner for internal stack (waste) pipe to outlet through the foundations

 

 

 

Long shot from rear of House of Foundations, Blockwork rising out of the Ground

 

 

 

Looking at Building Foundations from front of House

 

 

 

Looking at Foundations from front right corner

 

 

 

Internal levels reduced, internal blockwork at DPC, ready for clearing and Oversite Concrete 

 

 

Internal Drainage runs set in Pea Gravel

 

 

  Where Drainage pipes exit through external walls, cut boards are positioned and then Bends or Pipes are backfilled with Pea Gravel

 

    

 

After drainage runs are backfilled, Visqueen is laid ready for Oversite Concrete

 

 

Oversite Concrete 4-6 inch thick is laid

 

 

Oversite Concrete finished ready for internal DPC course and floor Joist's

 

 

Soil mountain taken away, levels reduced, joist now being fitted

 

 

 

Joist fitted ready to be nogged out (bracing)

 

 

Additional DPC (internal Tanking) to protect Joist ends and from penetrating Damp

 

 

 

 

Lapped DPC goes on every side all round as an internal Tanking effect

 

 

Drainage Pipe runs being laid

 

 

 

Blocks loaded out and stonework started, ongoing drainage runs being sorted

 

 

Preperation for French Drain, Bitumin type Paint solution applied to Blockwork below finished ground level

 

 

 

Bitumin Solution all round Base of House ready for Bituthene (Sticky back Bitumin sheets)

 

 

 

Bituthene applied with 100mm overlaps to painted Blockwork

 

 

Perforated (French) Drain pipe laid next to wall

 

 

Trench filled with Pea Gravel covering Drain to take away any underground water

 

 

Side of House, showing French Drainage pipe and Bituthened blockwork

 

 

 

Start of Pea Gravel in trench

 

 

Reverse angle pic looking at french drain covered with Pea Gravel, also see air vents tray DPC

 

 

 

See the next stage at Chapeltown 4 Bed Construction Progress 3